Tarmac Roadway in New Malden, Surrey

Project Info

TTS Surfacing Limited carried out a Tarmac Roadway in New Malden, Surrey. The area measured 2016m².

 

The Fairway and the part of Neville Avenue from the two brick piers close to Traps Lane to the third speed hump on Neville Avenue = 2016m²

Plane off area as necessary.
Adjust gully tops.
Machine lay 40mm of 10mm SMA wearing course macadam.
Remove and replace the two existing speed ramps on Neville Avenue and the existing speed ramps on The Fairway to match existing and reline markings in white.

Description

TTS Surfacing Limited carried out a Tarmac Roadway in New Malden, Surrey. The area measured 2016m².

Client:
Private Client
Date:
9th December 2020
Location:
New Malden, Surrey
Category:
Residential case studies, Tarmac Roadways